Back

Katowice: DL Invest Group once again trusts Eiffage Construction to build a high-end building

12.02.2020
Scroll
Katowice: DL Invest Group once again trusts Eiffage Construction to build a high-end building

A 21,000-square-metre building with a bold and highly technical architecture will be built in the centre of Katowice on Korfantego Avenue. Named DL Center Point III, this is the second project built by Eiffage for the DL Invest Group. Construction of the building, which will include offices and businesses, has just begun.

This new office building was designed in an attractive and vibrant area of the city to encourage better communication between all its neighbourhoods. Besides the offices, shops will be built in this building with a triangular shape and which will rise on 12 floors.
 
This building on Korfantego Avenue is the second Eiffage Construction project in Katowice for the DL Invest Group. The work of the previous project, the DL Center Point II, has just been completed. Eiffage Polska Budownictwo, a subsidiary of Eiffage Construction, owes these successes to its years of expertise. Having already carried out similar projects, this new project will be another success, according to Marek Kowalik, Director of the South Region of Eiffage Polska Budownictwo.

The design of the DL Center Point III requires specific equipment and construction methods. The building, built on former factory ruins, will have a reinforced concrete structure, with more than 21,000 m2 of net surface available. Modern materials and environmentally friendly solutions will be used. The building will be ready by the end of April 2021. The challenge of this building is to take into account a maximum of aspects for the comfort of tenants and residents living nearby. It is a key element of the neighbourhood revitalization plan and a symbol of the transformation of Upper Silesia from an industrial region to a knowledge service region.
 

“The guiding principle of all our activities is to have long-term relationships with our tenants. It would be impossible if we did not listen to their needs and trust each other. It is a great idea present at all stages of cooperation”
Dominik Leszczyński, CEO of DL Invest Group.

 
The project in a few words:

  • Number of floors: 12,
  • net surface: 21 208 m2,
  • commissioning planned: end of April 2021,
  • architectural design: Ostrowscy Architekci Biuro Projektowe,
  • general contractor: consortium of Eiffage Polska Serwis and Eiffage Polska Budownictwo.